The customer, a UK rail operator, was employing two full-time subcontractors from a specialist hydraulic equipment supplier, at a significant cost. A chief role of the subcontractors was to administer and manage hose assemblies required in the maintenance of rolling stock.

 

Find-out how the team at Hayley Kent was supported by experts at Gates to implement a hose self-assembly solution that reduced costs and downtime associated with any repair work. Download the case study.

 

 

Maintenance Essentials 9

This case study features in Issue 9 of Maintenance Essentials. Click the button below to find-out more: