THE SITUATION
by the site of £0.25, this translates to a forecasted annual cost-saving of £26,564.70. Extrapolated over a five year period, upgrading the two motor assets is set to save a significant £132,823.50 in energy costs. A payback period on the initial investment will be secured in the first year. As part of the analysis carried-out by WEG and HAYLEY DEXIS, a CO2e reduction of 20.5 tonnes per year has also been forecast.
THE SOLUTION
by the site of £0.25, this translates to a forecasted annual cost-saving of £26,564.70. Extrapolated over a five year period, upgrading the two motor assets is set to save a significant £132,823.50 in energy costs. A payback period on the initial investment will be secured in the first year. As part of the analysis carried-out by WEG and HAYLEY DEXIS, a CO2e reduction of 20.5 tonnes per year has also been forecast. collected with a couple of hours and taken to the workshop where the splined shaft was separated as per the customer’s request. A bespoke jig was created by HAYLEY 247 DEXIS engineers to conduct the repair. By the next morning, the customer had completed the repair and production was returned to normal.
"A TEN-WEEK PERIOD OF RUNNING AT 50% CAPACITY WOULD HAVE LOST THE COMPANY £1.3M."
THE RESULT
The lost production caused by the breakdown on the printing line was minimised significantly, thanks to the fast actions of HAYLEY DEXIS and the engineering capabilities of HAYLEY 247 DEXIS. A ten-week period of running at 50% capacity would have lost the company £1,300,000 in revenue, and this was prevented by HAYLEY 247 DEXIS splitting the shaft on an emergency basis.