Replacement Pulley Engineered For Rice Pouch Production Line, Preventing £2m Worth Of Downtime – CS208
THE SITUATION A line producing pouches of microwaveable rice had suffered a failure to a timing pulley. The Lead Technician had contacted their usual supplier who had advised that a…